1. Basic Formulas

Table of Content

  1. Pressure Gradient
  2. Hydrostatic Pressure
  3. Converting Pressure into Mud Weight
  4. Specific Gravity
  5. Equivalent Circulation Density
  6. Maximum Allowable Mud Weight
  7. Pump Output
  8. Annular Velocity
  9. Capacity Formulas
  10. Control Drilling
  11. Buoyancy Factor
  12. Hydrostatic Pressure Decrease POOH
  13. Loss of Overbalance Due to Falling Mud Level
  14. Formation Temperature
  15. Hydraulic Horsepower
  16. Drill Pipe, Drill Collar Calculation
  17. Pump Pressure, Pump Strokes
  18. Cost Per Foot
  19. Temperature Conversion Formulas

1.6 Maximum Allowable Mud Weight from Leak-off Test Data

ppg = (Leak-off Pressure, psi ) ÷ 0.052 ÷ (Casing Shoe TVD, ft) + (mud weight, ppg)

Example: leak-off test pressure = 1,140 psi, casing shoe TVD = 4,000 ft, and, mud weight = 10.0 ppg
ppg = 1,140 psi ÷ 0.052 ÷ 4,000 ft + 10.0 ppg
ECD = 15.48 ppg

⬆ Table of Content